Procurement can lead on energy efficiency, as long as it takes a whole-life view, argues city infrastructure director Tony Gale

That all nations need to make a joint stand on global warming and energy security is much discussed.

Governments have placed a spotlight on the issue by introducing EU legislation setting the 20-20-20 targets for carbon reduction and energy efficiency. These are: a reduction in EU greenhouse gas emissions of at least 20 per cent below 1990 levels; 20 per cent of EU energy consumption to come from renewable resources; and a 20 per cent reduction in primary energy use compared with projected levels.

Challenged by the state of the world economy, both the public and private sectors are facing punitive measures, such as financial penalties and carbon taxes, if they fail to meet these commitments by 2020. 

For many senior executives, it’s clear that introducing whole-life cost evaluations and future-proofing is a priority. However, an element of navel-gazing exists. Who is really responsible for delivering the systems and solutions? Is it the designer, contractor, facilities manager, or, dare I say it, procurement department?

In truth, whether it’s a new build or retro-fit development, many a well-designed, well-negotiated carbon and energy-saving project has come a cropper once it reaches the procurement department.

Why? Sadly, the pressure to get more for less puts undue emphasis on the metrics of capital expenditure rather than whole-life or operational cost. So it is a natural instinct to break solutions into constituent parts then push for the lowest price for each.

Of course, it’s tempting to stick with the principles of the traditional buying agreements that have served us for decades and are designed to squeeze suppliers down to the very last penny. Inevitably this causes them to resort to low-cost alternatives – such as selecting a £1 halogen lamp rather than a £200 LED equivalent. This may seem a great deal from a buyer’s perspective, but is surely a false economy. The halogen lamp will last six months, the LED 10 years or more, and replacing the halogen lamp costs £50 or more in maintenance costs every time, while the LED saves £0.66 in every £1 spent on lighting energy.


Energy-saving advice

1. Energy price and consumption should be collaborative targets. Energy costs will only increase, so while they need to be reduced, usage should also be driven down.

2. Facility and production improvements should include procurement from the beginning, since not understanding the value chain drives a disconnect.

3. Challenge the energy users to install measurement equipment and have plans for remedial action.

4. Discover where the main challenges of energy consumption, carbon emissions and water usage are, and engage the relevant departments to find ways to save money.

5. Change your mindset of capital expenditure versus operational savings.

6. Look to future-proof software upgrades to improve energy performance on a well-designed application. This is more cost-effective than intrusive refurbishments at a later date.

Configure your Portal

  • Main (left)
Configuration
CIPS SM Awards Logo 2012

The deadline to enter this year's CIPS Supply Management Awards has now passed. The shortlist of nominations will be announced on 21 June.

Click here for details of how to book your table.
WHITE PAPER


"Shape up with NRI - prepare and plan your negotiations better"

Reading Lines
Buyography blog logo
PMI reports logo

Check out the latest commodity prices.

View latest prices

  • Main (right)
Configuration
WHITE PAPER:
"Top Ten Technologies - Industry Report"
Top 10 Tech Supply Management_UK
WHITE PAPER:
"Driving Lasting Savings with Spend Compliance"
lasting savings
SAP

FREE WEBINAR


"Practical steps to strategic sourcing"

Click here to view the webinar

Q & A icon

Need advice on a procurement & supply chain or work-related matter?

Click here to get free expert advice.

Comments
Please enter your comments below
Fill out the all the boxes and click the 'Submit comments' button to make a comment on this page
*Comments are added to the bottom of the page. They are moderated and will not be published until approved by the Supply Management team. They may be edited. Please note unless marked “confidential” your feedback may be published on our letters page